A Bathroom Remodel--Day-by-Day
Day Eight
Monday, Feb. 16th.
The bathroom job is rolling, now. Kirk and Steve set the shower floor tile, put a coat of mud on the walls, and laid the dressing area floor. When everything goes as it should, and I'm not all tensed up waiting for materials to come in, I don't have a lot to report. The guys came to work, they showed up at the job, and did what they're supposed to do.
Steve cuts a tile. |
Kirk admires the dressing area floor. |
Here you can see the shower floor behind Kirk as he sets a tile in the dressing area. Notice the level in the shower? Good move, Kirk! |
Now--if every day and every job went like this--I could relax.
Until tomorrow,
Earl.