Monday, February 16, 2015

A Bathroom Remodel--Day-by-Day--Day Eight.

A Bathroom Remodel--Day-by-Day
Day Eight
Monday, Feb. 16th.

    The bathroom job is rolling, now. Kirk and Steve set the shower floor tile, put a coat of mud on the walls, and laid the dressing area floor. When everything goes as it should, and I'm not all tensed up waiting for materials to come in, I don't have a lot to report. The guys came to work, they showed up at the job, and did what they're supposed to do.

Steve cuts a tile.

Kirk admires the dressing area floor.

Here you can see the shower floor behind Kirk as he sets a tile in the dressing area. Notice the level in the shower? Good move, Kirk!

    Now--if every day and every job went like this--I could relax.
    Until tomorrow,
Earl. 